Club & Entertainment

Live House Kelapa Gading

Kelapa Gading, Jakarta Utara 2024 6 photos

The largest installation in the Live House network; a chain that has reordered up to 4 branches.

Project Archive See 6 field photos

Field Documentation

Installation photos: Live House Kelapa Gading

Click a photo to enlarge.

About this project

Live house AV system built for live stage needs: audio, lighting, and LED that must stay stable every show night.

After the first branch, the Live House network used WAW again in PIK, BSD, Batam, and Kelapa Gading; 4 branches in total.

Category and location are based on the WAW documentation archive. Per-item scope details are available in the project spec, which you can request during consultation.

Delivered through WFOS

Every WAW project goes through the same process: Consultation, Ground Inspection, System Design Process, System Solution, Delivery. Specs are written per item, installed as written, and looked after by WAW Care after handover.

Learn about WFOS
Line-item specs, real and honest Complete installation documentation WAW Care: 4 preventive + 6 corrective visits per year

Need a system like this?

Tell us about your space. We start by listening to the problem, not from a product catalog. Honest recommendations, no commitment.